Changes

no edit summary
Line 5: Line 5:  
So, you've done a full shutdown. Or, there was a power cut or zombie apocalypse that interrupted the ability of our physical servers to operate. The good news is that you now thing you're ready to turn things back on.
 
So, you've done a full shutdown. Or, there was a power cut or zombie apocalypse that interrupted the ability of our physical servers to operate. The good news is that you now thing you're ready to turn things back on.
   −
''Remember - during any power failure it is advised to immediately switch off the transmitter. See [[Shutting Down URY in a Hurry]].''
+
''Remember - during any power failure it is advised to immediately switch off the transmitter. See [[Shutting Down URY In A Hurry]].''
    
== Before You Start - Is It Safe Checklist ==
 
== Before You Start - Is It Safe Checklist ==
Line 99: Line 99:  
==Dante==
 
==Dante==
   −
* Open Dante Controller on one of the studio or production PCs (you might need Wogan up for this), and ensure that everything is happy and you see lots of green check marks.
+
* Open Dante Controller on one of the studio or production PCs (you might need Wogan up for this), and ensure that everything is happy and you see lots of green check marks. If you see any angry red X-es, mouse over them to check which box they're complaining about, and ensure it's powered on
 +
* Check that you can hear
 +
** Studio Red in Blue, and vice versa
 +
** Jukebox and News (beeeeeeeep) in both studios
 +
** AM on Phil in the office
    
== Additional Servers ==
 
== Additional Servers ==